Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Product Details
Customization: Available
Certification: TUV, ISO, CE
Condition: New
Still deciding? Get samples of US$ 16490/Piece
Request Sample
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2011

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, HSE
OEM/ODM Availability
Yes
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
  • Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader
Find Similar Products

Basic Info.

Model NO.
ER28
Load and Unload Mode
Front Discharge
Walking Mode
Wheeled
Dimension(Long * Breadth * High)
6470*2120*2960mm
Warranty
1 Year or 1200 Working Hours
Tyre
17.5-25 Tyre
Rated Speed
2200 R/Min(Rpm)
Engine
Weichai Wp6g160e20
After Warranty Service
Video Technical Support, Online Support
Min Turning Radius
5560mm
Bucket Capacity
1.6cbm
Warranty of Core Components
1 Year
Moving Type
Wheel Loader
Power
92 Kw
Max. Dumping Height
3500mm
Dumping Distance
950mm
Net Weight
7000kg
Trademark
Everun
Origin
Shandong, China

Product Description

EVERUN Construction Machinery CE  Certified 2.8ton ER28 Front End Wheel Loader

Product Description

 Standard Equipment:

Hydraulic Torque Converter, Tipping Cabin, Luxury Cabin Inside, Comfortable Seat, Adjustable Steering Wheel, Lock for Lifting and Steering Cylinder, Hydraulic - pressure Check System, Quick Hitch, Hydraulic Joystick, Heater, Backward Camera, Parallel Linkage, Bucket, Service Spare Parts

Optional Equipment:

Electric Joystick, E4 Lamp, Extra Hydraulic Line, Varta Anti-freeze Battery, LED Working Lamp, Tyre Chain, Loader Weigher, Automatic Lubrication Monitor, Different Attachments etc.

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

 

 Options:

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Specifications:

Item

specifications

Overall working weight

7000kg

Rated bucket capacity

0.72m3

Rated load

2800kg

Max. tractive force

65KN

Max. breakout force

≥65KN

Max. gradeability

30°

Max. dumping height

3500mm

Dumping distance

950mm

Overall dimension (L×W×H)

6470×2120×2960mm

Engine

Model

Weichai WP6G160E20

Type

Inline, water cooling, dry cylinder, direct injection

Number of cylinder-bore/stroke

6-108×125mm

Rated power

92kw

Rated speed

2200r/min

Mini fuel-consume ratio

≤210g/kw.h

Transmission system

Torque converter

Single-stage

Torque ratio

3.2

Transmission type

Planetary power shift

Grear shift

2 forwardshift, 2 reverseshift

Max. speed

21km/h

Front and rear axles

Main transmission type

Spiral gear, first stage decelerate

Final decelerate type

First stage, planetary gear decelerate

Tyre

Tyre specification

17.5-25

Front tyre pressure

275KPa

Rear tyre pressure

275KPa

Steering system

Type

Articulated load-sensing hydraulic steering system

Steering angle

±35

Mini turning radius

5200mm

system working pressure

16MPa

Boom lifting time

6s

Total time

11s

Brake system

Service brake

Air-on-oil, caliper-disk

parking brake

Manual caliper disc

Capacity

Fuel

80L

Hydraulic

80L

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

 

Packaging & Shipping

Packing: 1 unit in 40"HQ container

Delivery Time: 30 days after deposit

Payment Term: T/T 30% in advance and the rest against BL and the loading photos

Delivery Port: Qingdao port

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Our Services

 Excellent after-service can earn more market; this will always be first principle in Everun's culture. In order to make a good service for our European customers, we registered Everun Europe company in Germany which can supply spare parts, technical training for all European customers. Choose Everun, excellent service will be guaranteed.

We have enough spare parts stock in our stock and have professional engineer team, if you need any parts, we will send you with 2-3 days, and you will receive it with 7 days.

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Company Information

Qingdao Everun Machinery Co.,Ltd was established in 2007, has more than 10 years exporting experiences of wheel loaders and farming machinery. We have very much learned about the strengths and weaknesses of these machines. In 2011, we started to produce these machines ourselves under the help of our European customer. Most of our products are designed on the basis of European customers suggestion. Now Everun has two factories, one is in Qingzhou city, the other is in Jimo city. Everun products can be found working in more than 50 countries.

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

Certifications

 Products research and development is always one of the most important factors in Everun's success, now we are specializing in producing and exporting of wheel loaders, tractors, tillers etc. Everun has adopted ISO 9001: 2000, the international quality management system, and most of our products has also passed CE,SGS,TUV certificate, and we have Rops & Fops cabin patent certificate.

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

 

FAQ

 Q1. Are you manufacturer or trader?

A: We are manufacturer of wheel loaders, we have two factories, one in Qingzhou City, the other in Qingdao,. We design and produce wheel loaders by ourselves. 

Q2. What is your terms of payment?

A: T/T 30% as deposit, and 70% against copy of B/L. 

Q3. How about your delivery time?

A: Generally, it will take 20-25 days after receiving your advance payment. The specific delivery time depends  on the items and the quantity of your order.

Q4. Are you interested in dealership with local company?

A: No, we just do export business with overseas company, we do not sell machine to local trading company.

Q5. What is your warranty policy?

A: We can supply one year warranty or 1200 working hours for our machines. We will provide parts as free within warranty.

Q6. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery

Q7: How do you make our business long-term and good relationship?

A:1. We keep good quality and competitive price to ensure our customers benefit ; 2. We respect every customer as our friend and we sincerely do business and make friends with them,  no matter where they come from.

Everun Construction Machinery CE Certified 2.8ton Er28 Front End Wheel Loader

 

 

Everun Hot Sale ER28 2.8ton Mini Articulated Loader With Rock Bucket And Mixer Bucket

Everun Hot Sale ER28 2.8ton Mini Articulated Loader With Rock Bucket And Mixer Bucket

Everun Hot Sale ER28 2.8ton Mini Articulated Loader With Rock Bucket And Mixer Bucket

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier